Planning

Home
Up
PRINCE2 PL1
PRINCE2 PL2
PRINCE2 PL3
PRINCE2 PL4
PRINCE2 PL5
PRINCE2 PL6
PRINCE2 PL7

 

 

PRINCE2 Process Level: PL

Planning

Details:

Ø     as PRINCE2 is a product based methodology 'what' is to be produced is defined first along with its product description

Ø     ensure that the plan includes time and resources for project and quality management

Ø     the principles are What (e.g. description and quality), Why and How (e.g. by whom, what sequence)

Ø     basic steps (once the what, why and how have been answered):

o       when, by whom

o       amount of effort that will be required

o       determine how long it will take

o       determine quality control

o       calculate costs

o       decide on budget

o       assess risks

o       determine control points

Ø     plays an important part in:

o       SU6 Planning an Initiation Stage

o       IP2 Plan a Project

o       SB1 Planning a Stage

o       SB2 Updating a Project Plan

o       MP1 Accepting a Work Package

o       SB6 Producing an Exception Plan

Sub-processes:

Sub-processes in Planning are:

    Ø     PL1 Designing a Plan

    Ø   PL2 Defining and Analysing Products

    Ø    PL3 Identifying Activities and Dependencies

    Ø   PL4 Estimating      

    Ø PL5 Scheduling

    Ø PL6 Analysing Risks

    Ø PL7 Completing a Plan

 
 